Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


What glue is least sticky?


No Answer is Posted For this Question
Be the First to Post Answer

Post New Answer

More Civil Engineering Interview Questions

what"s the difference between fe 415 grade steel and fe 500 grade steel? and which one is mostly used for residential and apartment constructions?

6 Answers   L&T, SkyTech,


What is Purpose Difference in Stirrups For Beam & Column  ? 

1 Answers   Arpee Group,


I am planning to construction in my plot in Pune (Chandan Nagar) and its near about 1950 SqFt. Can some plz help me on the rate on per sqft for RCC,Brickwork & Plaster,Flooring,Water proofing,Door. Thank you in advance

1 Answers  


Whr should a joint be located in a beam if the provision of a joint is unavoidable??

2 Answers   BMTC,


what are the types of roads?what are the types of highway?

2 Answers   NG Project,


CM 1:4 !:5..what CM stands for?? and what is standard ratio used for external plaster??

4 Answers  


9*9 1:4:8 ratio using how to calculate the material for 40mm aggregate ,cement &sand please tell me answer

5 Answers  


how much cost of single coat 20mm thick plastering per sqre meter

0 Answers  


During reclamation how can the occurrence of mud waves can be rectified?

0 Answers  


How to design staircase.plz tell me formula for the design the staircase.

0 Answers   DMB Construction,


Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?

0 Answers  


the volume of cement req for 70cum of brickwork in 1:6 cement mortar is approx is equal to 3cum 5cum 7cum 1ocum

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)