Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


i wanted to know the quantity of cement and water cement ratio for 150mm*150mm*150mm mould.Grade of concret m20

Answers were Sorted based on User's Feedback



i wanted to know the quantity of cement and water cement ratio for 150mm*150mm*150mm mould.Grade of ..

Answer / om prakash

water cement ratio .40 to .45

Is This Answer Correct ?    3 Yes 1 No

i wanted to know the quantity of cement and water cement ratio for 150mm*150mm*150mm mould.Grade of ..

Answer / dharmendra barot

.15*.15..15*2500=8.43 kg
For M20 grade  1:1.5:3
Water cement ratio is  0.45
Cement required  4.86 kg

4.86*0.45=2.2 ltr

Is This Answer Correct ?    1 Yes 0 No

i wanted to know the quantity of cement and water cement ratio for 150mm*150mm*150mm mould.Grade of ..

Answer / amit

max w/c ratio for mild weather=0.55 & for moderate=0.50
cement quantity for 150mm cube is=(0.15x0.15x0.15x1/5.5)=0.00061kg...since grade of M20=1:1.5:3

Is This Answer Correct ?    1 Yes 0 No

i wanted to know the quantity of cement and water cement ratio for 150mm*150mm*150mm mould.Grade of ..

Answer / karthik

Cement - 0.02916kg

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?

0 Answers   ABC,


Kindly furnish the relation between 7 days strength & 28 days compressive strength of Cement Concrete cubes. Can you clarify whether the relation gets altered due to WATER- CEMENT ratio?

3 Answers  


SHEAR FORCE AND BENDING MOMENT DIAGRAMS

2 Answers   TCE,


what energized you to complete your course?

0 Answers  


Floor to floor high of domestic building is 3m design a quarter turn staircase starting assume taken give a suitable diagram of it?

0 Answers  


Characteristics of a model project are ––

1 Answers  


What is the diffrence between FE 415 & FE 500 TMT BARS

7 Answers   Gammon, Sail,


which is the cheapest type of temporary flooring(say for using 6 months on)?

1 Answers  


Every Engg. know that =dia*dia/162.2 is Steel weight Formula, But very less people Know that orgin of 162.2 asumption.

3 Answers   ATS, Eurotech Construction, Juniper Networks,


how to calculate of m20 c.c road work 1cu.m

0 Answers  


how to calculate the length diamond shaped striupps in column

0 Answers   Marg,


why crakes are developped in opening corners

3 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4453)
  • Electrical Engineering Interview Questions Electrical Engineering (16638)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)