why we use cement for concrete
Answers were Sorted based on User's Feedback
Answer / pabitra chandra paul
We use cement in concrete as a binder material.
| Is This Answer Correct ? | 10 Yes | 0 No |
Answer / er. shivam dixit
cement is used in concrete because it attain good strength
rapidly than other binding material
2. cement paste fill all voids in between agregates.
3. cement easily available in any location.
4. cement is water tight, water repellent and not affected
by any weathering agencies.
5. cement create good bonging with all inert material in
concrete.
these are some points because it could not easy to define
why we use cement in concrete because this topic is very
wide and lots of time to explain, i will providing a non
stop 1 hrs lecture on that topic
| Is This Answer Correct ? | 7 Yes | 0 No |
Answer / md imranul hassan
cement is cohessive in nature and it work as a binding
material and provide surface area for hydration which bring
the strength for concreting material.
| Is This Answer Correct ? | 3 Yes | 0 No |
Answer / nadim
It is the cement that binds the sand and gravel or crushed rock together to form what we call concrete
| Is This Answer Correct ? | 3 Yes | 1 No |
how to calculate the load bearing capacity of slab hos thickness and steel are already given?
Define What are the materials used in building a gravity dam?
how do you calculate the length of "L" of main & distribution bar for reinforcing of raft footing.
5 Answers Dee Vee Projects, L&T,
How to find quantity of cement mortar? I want to know the req quantity of cement for plastering 300 sft in final coat with 12 mm. Any math involved? Plz help
31 Answers Asia Engineering, GMS, LTT,
which percentage is maximum in good quality cement?
Why did you choose this career?
how much cement consumption in box type waterproofing
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
Difference between Ghol , Chimney & fly ash bricks b)Floor to floor height is 3m , rise=15cm , tread 20 cm , how to design staircase means steps landing
could u tell me how to used deform stell bar in reinforce concret?i wanna know the general using in the site!
How many required steel of 1m3 slab casting?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)