A reservation is triggered from a maintenance order and user is trying to issue material from warehouse with reference to the reservation. But system is not allowing goods issue? What I need to check?
No Answer is Posted For this Question
Be the First to Post Answer
What are the functions of using equipment master?
How pm module is integrated with mm module?
What is service entry sheet? Why it is important for plant maintenance module?
What is the use of PM02 control key??
how much counter we can assign for multiple counter plan
Differentiate between work center and main work center.
What is corrective maintenance?
I have scheduled a maintenance plan but I am unable to see the all due (plan) dates of maintenance order in schedule overview. Which setting will I check in maintenance plan?
Suppose there is a difference between the planned and actual hours of internal manpower where will you document the reason/ cause of this variance. Is there any standard sap facility available to address such situation.
1)can we create a maintenance plan without planning the cost in it?
2 Answers Accenture, CSC, IBM, Ronak, Sabic,
What is purpose of construction type in equipment master?
How to configure the integration of pp and pm, where it is being done in spro, what are the pre-requisite and what are the steps?