Do we need to run this transaction code ip30 for all the maintenance plans which are scheduled on regularly daily basis or weekly basis so that if any scheduled object exists then it will get converted into the service order ?
No Answer is Posted For this Question
Be the First to Post Answer
How can we assign measuring points to a strategy plan like compressor running hrs
How would you attach a drawing to the equipment master data?
Is it necessary to run the ip transaction code for each maintenance plan that we have scheduled ?
What is item category?
How does actual cost of maintenance come on maintenance order?
How would you define equipment/material loaned to a customer?
Explain the integration points between pm and mm/fico during the pm configuration?
Which t code can give you the list of all pending preventive maintenance order for the coming month?
Suppose there is a measuring point for temperature and while recording the values of temperature there is a deviation of values from given limits? Is it possible to throw a warning or error message? What is the configuration setting available?
explain business completion?
Differentiate between work center and main work center.
What do you understand by horizontal and hierarchical data transfer?