What things architect have to take care of before starting any project?
No Answer is Posted For this Question
Be the First to Post Answer
What should be the Min.Penetration in a hard rock for all pile diameteres?
what are the compressive strength requirements(in 7 days & 28 days) of cement sand mix used for plastering purpose (Cement:sand-1:6)? Kindly give the IS Code reference also.
What you understand by building codes?
For submitting the project loan for bank Residential bldg,Suppose we take Provinding RCC mix 1:2:4 for footings No of footings,length ,Breadth,Height ,qty in cum, at last unit/Rate(Rs) ,i would like to know how do we get the unit/Rate
how to calclate the cemment for 1 cubic metre of 1:2:4 concrete
Please tell me 1 Sqm Steel 14mm center to center .200,.200
a butt weld is specified by
how do you intend to overcome such challenges?
What is the proportion in M-20, M-25, M-30 grade of concrete?
How to calculate the Qty of Mortar in 1 m3 Brick work? Detailed Calculation Required?
Which is quantity of cement in 1 cu.m. concrete of M25 grade
how to take out quantity of steel used in column and beam?? what is standard formula for it???
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)