What things architect have to take care of before starting any project?
No Answer is Posted For this Question
Be the First to Post Answer
what is meant by geosyntahtic system
How Much span required for 1 sqm of shuttering(Beam & Slab)
How much cement and water required for cement selery????
What is design life of a bridge?
In T beam design, which are the regions selected as rectangular and Flanged ?
What is c.g.i sheet which used for roof??
tell me how to calculate by weight and by volume the quantity of cement sand mortar of 1:2
How many pyramid in egypt?
Give me an example of a time when something you tried to accomplish and failed.
1. 1. The mass of a chunk of moist soil is 34 Kg and its volume is 0.012 cu. Meter. After drying in an oven, the mass reduces to 14.25 Kg. Determine the water content, the density of moist soil, the dry density, void ratio, porosity and degree of saturation. Take G = 3.25
what is thumb rule for calculating the size of ISMB required for a particular length of span
IF X = Cement ,Fine Aggregate & Coarse Aggregate are in taken in weights for batching. Y= Cement , Fine Aggregate & Coarse Aggregate are taken in volume for batching. Then what will be the relation between X and Y?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)