how to calclate the cemment for 1 cubic metre of 1:2:4 concrete
Answers were Sorted based on User's Feedback
Answer / dipak rakibe
TO DERIVE THE QUANTITY OF INGREADIENT MATERIAL FOR 1 CUBIC METER OF CONCRETE FOR M-15 GRADE
Proportion for M-15 Concrete is 1:2:4
For Easy Calculations Take/Assume 10 Cu. m. of concrete.
Proportion
10 X 1.52 = 15.2
(Here 1.52 is the dry volume factor)
A) Quantity of Cement =
For 10 cum of concrete
(1/ 1+2+4)= 0.143 X 15.2 = 2.17 Cum
1 Bag of Cement = 35 Liters = 0.035
Quantity of Cement Bags = 2.17/.035 = 62.10 Bags
for 1 cum of concrete = 6.21 Bags
B) Quantity of Fine Aggregates/Sand
For 10 cum of concrete
(2/ 1+2+4)=0.285 X 15.2=4.33 Cum
Quantity of Sand = 4.33 Cum
for 1 cum of concrete = 0.43 Cum
C) Quantity of Coarse Aggregates/ Gitti
For 10 cum of concrete
(4/ 1+2+4)= 0.571 X 15.2 = 8.68 Cum
Quantity of Gitti = 8.68 Cum
for 1 cum of concrete = 0.87 Cum
Summary =
A) Cement Bags= 6.210 Bags
B) Fine Agg./Sand=0.43 Cum
C) Coarse Agg./Gitti = 0.87 Cum
BY Dipak Rakibe
Is This Answer Correct ? | 9 Yes | 1 No |
1 cum of 1:1:4 concrete
Dry volume equal is 1.52
Cement equal is 1/6*28.8*1.52 =7.2 bags cements
= 364.8 kg cements
Is This Answer Correct ? | 0 Yes | 3 No |
Is it worthwhile to carry out tests on particle density of soil particles for geotechnical design?
How much is anchor length ?
how to determine the correctness of proportion used in cement mortor and various IS codes to determine the same?
how to calculate rate analysis for shuttering of waffle slab
How to calculate the individuals quantities of cement,sand,and aggregate having 1:2:4 ratio for 50 cubic meter area.
1 Answers Aparna Constructions,
hi, i am doing my B.tech third year and i want to have a job in Genpact...So can you help me which kind of job would be more appropriate for me in such a company and How should i prepare for an interview?
What is the name of this multiplication factors ?
0 Answers Engineers India Limited, L&T,
if rise and tread of stairs rae 16 & 25cm with landing slab of thickness 100mm . If there are 8steps, and carpenter ask for to mark the bottom of centering of landing on column, what will be the height above floor finished level?
residential projects,structural.
0 Answers Ambuja, KBR, Saudi Aramco Shell Refinery Company SASREF,
What is the difference between Backfilling & Refilling in Earth Work Group Item ?
define prestressing? compare prestressing with post tensioning?
what would be the design load of R.C.C Cooling tower per cell.?