for pretensioning which will yield first and same for post
tensioning?
No Answer is Posted For this Question
Be the First to Post Answer
What is the quantity of cement, sand, and gravel to be used in M20 grade of concrete for 1000 x 1000 x 1000 mm of sand (for cement please mention in kilos, and for sand and gravel please mention it in CFT)
How to calculate the dia of reinforcement when required (as per drawing) dia of reinforcement steel not available at site?
3 Answers MNC, N J Devani Builders, Simplex,
Why we use Reinforcement out side of the column not in centre
The name priyesha Deshmukh is associated with A) literature B) shooting C) wrestling D) golf
how many binding wire can be required for 1 metric tonne steel?
can any give me bhel n other govt sec interview question
HOw to find the depth of foundation?
how you calculate the data (all parameter) after transient response method i.e.pile intigrity test on pile.
what is the stripping time of beam column & slab?
Construction joint of beam & slab is provided at––
Define What is a kip?
what is work of planning deptt. in any construction compny (in road project)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)