How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
No Answer is Posted For this Question
Be the First to Post Answer
what is the bend correction for 90 degree of bend in any dia of HYSD steel reinforcement as per IS code ?
How to come 1.54 from dry to wet concrete?
In a slab where does the Uniformly Distributed Load (UDL) act?
How much area can plaster with one bag of cement?what is the size of the fuji blocks?
Why is loose concrete removed from the surface where new concrete is to be done?
time and work questions
How to calculate Rate of 10 cum of Brick masonary,if the rate of material are as fallow? sand=Rs.500/mt Brick=Rs.5/brick Labour=Rs 300/day Free issue=cement+water+electicity.
Why we stop the concrete in 1/3 rd of span length
per 1 cumt concrete how much manhours is required including shuttring,steel etc.,for slab & foundations
what is the formula for calculating concrete in circular column ? pls explain with diagram add a link for diagram
What is m & 20.& what is fe&415.
why we are using 190x90x90 mm of brick size?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)