Why we stop the concrete in 1/3 rd of span length
Answer / anuranjan kumar
after l/3 tesion zone develope in mid span so always stop concreting with in l/3
| Is This Answer Correct ? | 13 Yes | 2 No |
Sand density
How to do lineout of building
if a pipe those configuration (ASTM c 76 class b 450mm dia 2500mm length) fixing for water course those lining of water is 7000 running meter. my question is that if 8 joints of pipe ls leakage and we have not permission to stop the water so which treatment we apply on joint in that in condition.
how many square meter plastering get from 1 cubic meter cement mortar for a thickness of 12mm
Grades of concrete
28 Answers Mittal Steel, UNOPS,
In concrete mix, water is required . we tried in case of water we are used milk. what hapened
What is the allowable silt content for concrete works?
how much least count of levelling ?
How many bricks,sand,cement in 1m3 bricks masonary
3 Answers Ascent, Superior Hi Tech,
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
Define What is diversion tunnel in a dam?
what is the coefficient for running feet to cft coversion both area and price
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)