Answer / k. bu.babu
As per IS code :1077-1957
Standered size 19 cm x 9 cm x 9 cm
and motor joint should be 10mm thick
| Is This Answer Correct ? | 28 Yes | 4 No |
Answer / amey pathak
we are using standard size of brick 19*9*9cm
because as we know mortar should be 10mm
so that with mortar size brick should be 20*10*10cm
which is easy for calculating No. of bricks in
structure.........
| Is This Answer Correct ? | 18 Yes | 2 No |
Answer / amit soni
You all guys know it is nominal size 19 x 9 x 9mm and its IS standard, but in execution of works we use 23x11x7mm/ or 220 x 100 x 8mm different modular & non modular sizes in different states, but main thing is that the volume of 1 brick should matched with 19x9x9mm in all conditions
| Is This Answer Correct ? | 0 Yes | 1 No |
how to reduce size of column 450 x 750 to 230 x.... if it is cut in area of bathroom? means it appears in bathroon any shifting or any other option....building is g + 10 and the bathroom is at first floor...
what is SHEAR WALL ? why and where it is provided.
how cubic feet cement,sand,aggregate required for 1 cubic feet ratio=1,1.5,3
what will be the total emoluments for deputy surveyor in APPSC in the payband of ( 9460-27600). please give me the detailed information step wise?
after temping in cbr mould keep how many hours mould in water
what is raft foundation
What is meaning of M25 grade
How many bricks,sand,cement in 1m3 bricks masonary
How to calculate cement quantity in m20 concrete
2 Answers nnovative Constructions, Shapoorji Pallonji Group(SPCL),
How to find weight of steel in kg if we know the area which is in m2? Following details are known to us, Area=125m² thk of slab=250mm Steel details:T12@200 PS:considering mesh top and bottom with X and Y direction
what is the full form of following sueface type of road - AC,CC,(PM,DM,SB),(CG,Ma,Me), G,E,O
how we can calculate the quantity of sand & cement & also Aggregate so give me to this answer for a slab Length is : 25' /3.28 = 7.62 Mtr Width is : 30' /3.28 = 9.14 Mtr Depth is : 0.6"/3.28 = 0.15 2Mtr
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)