What is ngl level and how it is transfer to column or beam??
Answer Posted / karnam seenu
Natural ground level is a reference level used to mark the floor height for different floors. This can be done by considering NGL as Temporary benchmark and transferring to the column surface or a permanent pillar constructed and maintained till completion of the project since this reference will be taken for all marking of bottom level of slab beams, slab top level, plinth top level, footing top level, etc., by using theodolite instrument or Total station or by simple Dumpy level
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
What is the standard specification of MOR and Water Absorption of Homogenous Ceramic Floor Tiles?
What is the force exerted by the tacoma narrows bridge?
WHAT IS YOUR CURRENT SALARY
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
Tell me about triple point of water.
What is Architect-Prepared Contract?
afe or not
Give list of building construction equipment & explain about them in brief. How much is output of JCB, POCLAIN, Steel cutting & bending machine, material hoist, tower crane?
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
What is the zero value in quantity surveying
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
five benefits of using standard terminology in the measurement process
How to calculate brick work quantity?? Block work quantity??
Is it necessary to apply tack coat over the primecoat. IF not what happens.answers other than 1.to superimpose the next layer(2) to adhere the layers so as to form homogenity.
how will remove spiderweb cracking in plaster ? what the reasone of make it ?