how to find the cement bags and sand requirements for the one square meter of internal,external,ceiling plastering by using the various ratios like 1:3,1:4,1:5,1:6
No Answer is Posted For this Question
Be the First to Post Answer
how to find quantity for binding wire steel.
Till how many days can we keep a cement bag without using? And on what conditions the cement will get spoiled?
wha is frog?
I'm diploma civil engineer. My question is what better after diploma 1- BE/B.TECH 2.EXPERIENCE Pls.suggest.
what is spt
what is meant by VDF FLOORING? why it is used?
Mujhe koi ye bta do ki 1.54 hi ku lete h material ki quantity niklne ke liye Sab jgha dhund liya bt samj nhi aaya mujhe koi alag aalag krke smjao ki cement m aggr. Dust m itne % wet or dry % hoti h fir kaise kaise 1.54 aaya kha se aaya smjao koi pls m confuse hu my calling nd wts app no. Is +919034604938
3 Why do you want to work at our company?
what"s the M book?
How to check percentage of bulkage of sand in RCC?
2. What are the advantages of your present job, things you like about it?
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)