Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Question 67 – In order to predict the wastewater production, the population number has to be understood. The population data is : 72000 (for year 1961 or P-1961), 85000 (for year 1971 or P-1971), 110500 (for year 1981 or P-1981). (a) Find the average population increase, or [ (P-1981 - P-1971) + (P-1971 - P-1961) ] / 2. (b) Find the average percentage population increase, or [ (P-1981 - P-1971) / P-1971 + (P-1971 - P-1961) / P-1961 ] / (2) X 100. (c) Find the incremental increase or P-1981 - 2 (P-1971) + P-1961. (d) Let Po = P-1981. After 2 decades or n = 2, the population is P-2001. By using arithmetical increase method, find P-2001 = Po + n (Answer for a). (e) By using incremental increase method, find P-2001 = (Answer of d) + n (n + 1) (Answer of c) / 2. (f) By using geometrical increase method, find P-2001 = Po [ 1 + (Answer of b) / 100 ] ^ n where ^ is power sign, or 1 ^ 2 = 1 x 1 = 1. (g) If the actual P-2001 = 184000, which method of estimation is more accurate, based on your answer in (d), (e) and (f)?



Question 67 – In order to predict the wastewater production, the population number has to be u..

Answer / kang chuen tat (malaysia - pen

Answer 67 – (a) Average population increase = [ (110500 - 85000) + (85000 - 72000) / 2 = 19250. (b) Average percentage population increase = [ (85000 - 72000) / 72000 + (110500 - 85000) / 85000 ] x 100 / 2 = 24.025. (c) Incremental increase = 110500 - 2 (85000) + 72000 = 12500. (d) P-2001 = 2(19250) + 110500 = 149000. (e) P-2001 = 149000 + 2 (3) (12500) / 2 = 186500. (f) P-2001 = 110500 (1 + 0.24025) ^ 2 = 169973. (g) Errors of answers : (d) 184000 - 149000 = 35000, (e) 184000 - 186500 = -2500, (f) 184000 - 169973 = 14027. Answer (e) or incremental increase is more accurate to such data, or the most accurate prediction among the three available formulae. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.

Is This Answer Correct ?    0 Yes 0 No

Post New Answer

More Chemical Engineering Interview Questions

In Galvonised iron and stainsteel pipes, in which pipe friction losses will more and why ?

0 Answers  


What are the criteria’s involved in choosing mass balances for components?

0 Answers  


Should slurry pipes be sloped during horizontal runs?

0 Answers  


ENGINEERING DRAWING - EXAMPLE 18.2 : For a Vernier scale that consists of 0.11 cm per section, estimate the length on actual standard ruler of 0.1 cm per section for 2.39 m and 0.91 m.

1 Answers  


Experiment constitutes 1000 ml of 10 ppm dye solution and 0.2 g catalyst mixed in beaker. How to calculate the initial of concentration?

1 Answers  


sir i am senthil B.Tech Chemical Engineer which book is refer for objective type questions?

2 Answers   BARC, GATE,


Mention some of the specialized grinding methods?

0 Answers  


ACCOUNTING AND FINANCIAL ENGINEERING - EXAMPLE 34.19 : In the purchase of a unit of engineering office, a loan has been made to a bank with the following details : Term N = 30 years; interest rate R = 8.07 % / year; security : primary residence; present value pv = $450000; salary = $75000 / year or $56000 / year after tax. (a) Let the discounted present value PV = [ 1 - 1 / (1 + r) ^ n ] / r for arrears, where r = interest rate of discount, n = number of payment, ^ = symbol for power. If the loan repayment was made monthly : (i) calculate the value of r where r = R / k and R is in decimal value; (ii) find the value of n where n = kN; (iii) estimate the value of k where k = number of repayment per year; (iv) calculate the value of PV based on the formula of discounted present value. (b) Calculate the monthly repayment of the loan, MR based on the following formula : pv = PV x MR. (c) Find the percentage of salary remains after paying the loan every month.

1 Answers  


What are the three classes of organic solvents?

0 Answers  


In Distillation Process heat transfer and mass tansfer will occur or not? alsowhere it will takes place?

2 Answers  


CHEMICAL ENERGY BALANCE - EXAMPLE 11.3 : For liquid benzene, the CP constants are : a = 129440, b = - 169.5, c = 0.64781. Reference temperature is 298 K. The temperature of benzene is 60 degree Celsius. Calculate the enthalpy of benzene by using the formula H = a (DT) + (b/2) (T^2 - TREF^2) + (c/3) (T^3 - TREF^3) where ^ is power, DT is temperature difference with TREF = 298 K. H is in J / kmol. DT = T - TREF.

1 Answers  


Suppose you have hot oil and cold water, what kind fluid you flow In shell side and tube side and why?

5 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)