What is load?
No Answer is Posted For this Question
Be the First to Post Answer
Hi, This is Naveen, plz if anybody have experience of IOCL interview, send me question.
QUANTUM BIOLOGY - EXAMPLE 33.8 : (a) Let ^ be the symbol of power where 1 ^ 2 = 1 x 1 = 1, 2 ^ 2 = 2 x 2 = 4. Let the number of electrons in a human body to be 10 ^ 28 = A, the number of all of the grains of sand on Earth planet to be 7 x (10 ^ 20) = B, the number of all the stars in the visible sky to be 8 x (10 ^ 3) = C. By assuming that every star in the visible sky has the same number of grains of sand as on Earth planet, prove by mathematical calculations that there are more electrons in one human body compared to the number of all of the grains of sand on the stars in the visible sky. (b) The incoming solar radiation to the Earth's surface is mainly from sun. Around 51 % of the radiation is absorbed by Earth's surface. Around 19 % is absorbed by atmosphere and clouds. In term of reflection, 4 % of the radiation is from surface of Earth, 6 % is reflected by atmosphere and the rest is reflected by clouds. Find the percentage of radiation absorbed by and reflected by biological beings on Earth, with reason for your response.
Is there a quick rule-of-thumb to estimate a gas side heat-transfer rate inside the tubes of a shell and tube heat exchanger?
i am a prefinal year student of polymer engineering .could you please send the latest question papers regarding entrace exam.
Why is double the amount of gas collected in one of the test tubes in electrolysis of water than th amount collected in the other? Name this gas?
How can wet carbon dioxide be responsible for a corrosion problem in iron-containing metals?
What are the customization steps in sap?
how FOULING effectd the heat transfer rate
NATURAL GAS ENGINEERING - QUESTION 26.1 : (a) In natural gas pipe sizing, the length of the pipe from the gas source metre to the farthest appliances is 60 feet. The maximum capacities for typical metallic pipes of 60 feet in length are : 66 cubic feet per hour for pipe size of 0.5 inches; 138 cubic feet per hour for pipe size of 0.75 inches; 260 cubic feet per hour for pipe size of 1 inch. By using the longest run method : (i) Find the best pipe size needed for the capacity of 75 cubic feet per hour. (ii) Estimate the suitable range of capacities for the pipe size of 1 inch. (b) The maximum capacities for typical metallic pipes of 50 feet in length are : 73 cubic feet per hour for pipe size of 0.5 inches; 151 cubic feet per hour for pipe size of 0.75 inches; 285 cubic feet per hour for pipe size of 1 inch. By using the branch method find the best pipe size needed for the capacity of 75 cubic feet per hour when the length of the pipe from the gas source metre to the appliance is 52 feet.
What is Pinch Technology?
When using a pumping loop to mix two miscible fluids in a tank, when can the content are considered well mixed?
Solve the first order differential equation : (Z 1)(dy/dx) = xy in term of ln |y| = f(x). Z = (x)(x).
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)