Question 67 – In order to predict the wastewater production, the population number has to be understood. The population data is : 72000 (for year 1961 or P-1961), 85000 (for year 1971 or P-1971), 110500 (for year 1981 or P-1981). (a) Find the average population increase, or [ (P-1981 - P-1971) + (P-1971 - P-1961) ] / 2. (b) Find the average percentage population increase, or [ (P-1981 - P-1971) / P-1971 + (P-1971 - P-1961) / P-1961 ] / (2) X 100. (c) Find the incremental increase or P-1981 - 2 (P-1971) + P-1961. (d) Let Po = P-1981. After 2 decades or n = 2, the population is P-2001. By using arithmetical increase method, find P-2001 = Po + n (Answer for a). (e) By using incremental increase method, find P-2001 = (Answer of d) + n (n + 1) (Answer of c) / 2. (f) By using geometrical increase method, find P-2001 = Po [ 1 + (Answer of b) / 100 ] ^ n where ^ is power sign, or 1 ^ 2 = 1 x 1 = 1. (g) If the actual P-2001 = 184000, which method of estimation is more accurate, based on your answer in (d), (e) and (f)?
Answer Posted / kang chuen tat (malaysia - pen
Answer 67 – (a) Average population increase = [ (110500 - 85000) + (85000 - 72000) / 2 = 19250. (b) Average percentage population increase = [ (85000 - 72000) / 72000 + (110500 - 85000) / 85000 ] x 100 / 2 = 24.025. (c) Incremental increase = 110500 - 2 (85000) + 72000 = 12500. (d) P-2001 = 2(19250) + 110500 = 149000. (e) P-2001 = 149000 + 2 (3) (12500) / 2 = 186500. (f) P-2001 = 110500 (1 + 0.24025) ^ 2 = 169973. (g) Errors of answers : (d) 184000 - 149000 = 35000, (e) 184000 - 186500 = -2500, (f) 184000 - 169973 = 14027. Answer (e) or incremental increase is more accurate to such data, or the most accurate prediction among the three available formulae. The answer is given by Kang Chuen Tat; PO Box 6263, Dandenong, Victoria VIC 3175, Australia; SMS +61405421706; chuentat@hotmail.com; http://kangchuentat.wordpress.com.
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Hi, Please give me chemical engineering paper for IOCL exam for entire written exam, GD and personel interview model questions to my email id. (chemistnathan@rediffmail.com) Rgds, Ragu
I want to know that what type of questions may be come for fertilizer company for written exam?
PLZ ANYONE SEND ME PLACEMENT PAPERS OF I.O.C.L MY ID---- gaurav.nitw.5609@gmailcom
What particle sizes are electrostatic precipitators used to remove?
When using a pumping loop to mix two miscible fluids in a tank, when can the content are considered well mixed?
What's -74C, dew point is better the -70C dew point In draying unit .
friends....i have been searching the model paper for HPCL officer trainee for chemical eng....tat apptitude section...if u people got any information regarding tat...please send me to my mail...my id is: maruthu.flower@gmail.com...pls send me wtever information u knew....thank u....
What factors go into designing the vapor space of kettle type reboiler?
Explain the method of determining maximum differential pressure during hydro testing of shell and tube heat exchangers?
Plz if anybody has placement paper of HAL mail me i m Chemical engg my id er.kotnala@gmail.com
What is the practical particle size limit for pneumatic conveying?
The process conditions of the fuel gas are as follows: Temperature = 25 deg C Pressure = 4 bar g Calculate the line size for the fuel gas supply line to the superheater
what is designing step of heat exchanger
Hi, I want to validate an analytical procedure of a specified impurity, but this impurity is unavailable for me. can I use the API instead of impurity in the linearity test? in Which reference can I find such information?
Is there any way to slow coke formation in ethylene furnaces?