For M30 grade how much cement bags will need for one cubic meter qty
Answer / done
Unit wt of M30 concrete = 2400 cum (approx)
Each bag Wight's 50 kg
Therefore 2400/50=48 ~50 bags of cement will be required
| Is This Answer Correct ? | 2 Yes | 11 No |
How u can calculate the Octagon ring distance from center of raft in 275 mtr chimney slipform errection? cantact no:0993455097
How many material do I need to finish a 340sqms using 190 block size and 700mm x 450mm x 200 mm concrete including of outside and inside plastering
How do You Maintain a structure after getting cube test of low strength.
cement mortor 1:5 for 30 m2 12 mm tk plastering so how to calcualte its rate
how much of quantity of material required for execution of one cubic meter of random rubble masonry in 1:3 cement mortar
methode of psc girder stressing
what is the minimum spacing required for slab & beam reinforcement
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
what is lever arm constent formula?
how to calculate the quantity of material in 1 cubic meter Concrete?
what is procedure of ordinary pile foundation detial?
how do make a measuring box for 1 cubic metre of 1:2:4 concrete for 350kg
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)