For M30 grade how much cement bags will need for one cubic meter qty
Answer / done
Unit wt of M30 concrete = 2400 cum (approx)
Each bag Wight's 50 kg
Therefore 2400/50=48 ~50 bags of cement will be required
| Is This Answer Correct ? | 2 Yes | 11 No |
How can we calculate quantity of slab, beam @ column ? Beam should be calculated by deducting slab thickness or slab should be calculate in to in ?
plz tell me max persantage of sand for every mix design by volume or weight.
What the codes used for Rigid Pavement and Flexible pavement.
How to calculate the quantity of cement,sand,aggregate for the area L*B*T are 15.24 m*21.36m*0.12m in the ratio 1:2:4 can any ine explain in detail by using formulas. Thanks in advance
What is Critical path in Ms-Project ?
Why are L-beams (cast monoloithic with slab)that usually occur at the slab edge, provided with overhangs?
What is the ring size of column 600x400 (8mm dia ring) ?
What is the dimension of Slump cone which is used to measure the Slump value of concrete? Slump value for Pile concrete? Slab concrete? Column concrete?
how to determine the foundation footing reinforcement spacing
why are you joining in this (applied post) job and your aim for this job
How to calculate the quantity for masonry(block and plaster)?
#include<stdio.h> main() { int a=300,b,c; if(a>=400) b=300; c=200; printf("\n%d%d",b,c);
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)