M30 me kitan pani lagat hai
No Answer is Posted For this Question
Be the First to Post Answer
what is the bar bending schdule
how many cement and sand required for 1m2 plastering 1:4 cm
plz drive the formula d2/162.162 for the calculation of weight of steel bars????
What is the basic difference between OPC
what do u mean by shear?and tension?
6 Answers L&T, Shoba Devlopers,
1.how to calculate 4*3 runner qty in cft. 2.how to calculate the nails qty.(column,beam,slab) 3.if any formula for binding wire qty calculation.
What is the difference between Design and nominal mix?
how to calculate quantity of cement and sand for plastering works in CM 1:6 proportion.....plz answer anyone.....and write the formula...
what are the Cement Coefficient for Block Work & plastering Work?
is it correct method to use crush sand in concrete as per is code
we have a bore well 275 depth & water is deliver at distance of 1000 feet from the borewell here iam not include the distance of depth and the deliver water horizontally at our reserviour tank on ground level
What is the amount of work done by a carpenter, bar Bender and plaster Mason in interior and exterior plaster
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)