Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


Deshuttering time for slab 6.15 meter

Answers were Sorted based on User's Feedback



Deshuttering time for slab 6.15 meter..

Answer / honnikery-007

deshuttering time for long span 21 days

Is This Answer Correct ?    4 Yes 0 No

Deshuttering time for slab 6.15 meter..

Answer / atul priyadarshi

21 days after casting.

Is This Answer Correct ?    3 Yes 0 No

Post New Answer

More Civil Engineering Interview Questions

how will i find leakage in underground?

2 Answers  


Cement , sand , concrete ration in M30 Grade

1 Answers   ADITI,


What are the tests conducted on coarse aggregates ?

3 Answers   Rites,


What is the Alternative material of cement, We use for Floor tilling and Wall tailing purpose?

1 Answers   Jain Housing,


What is Refuse Area ? And What is Definition ?  

2 Answers  


What do you mean by Hydraulic Piling??

2 Answers  


i have open space in my house, i want to make pcc there, si want to know how i calculate material , my area measurement is 10' x 10' x .25', pls tell me how much need cement, sand, concrete,if possible u than pls tell me the formula

1 Answers  


what motivates you to do a good job

1 Answers   Flextronics, HPCL, ISRO,


in M-20 Grade of concrete what do u mean by (M)

15 Answers   GVK,


how calculate the cube strength in percentage

1 Answers  


Every Engg. know that =dia*dia/162.2 is Steel weight Formula, But very less people Know that orgin of 162.2 asumption.

3 Answers   ATS, Eurotech Construction, Juniper Networks,


for Precast foundation howmany days required we can shift the foundation with american Standards i need reference with section any body can help

0 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)