how to calculate steel quantity of column from steel design
Answer / pappammal
Bar bending schedule method is used to find out the quantity of steel
| Is This Answer Correct ? | 10 Yes | 1 No |
why reinforcement is not provided at centre for beams r column
Define slump in terms of slump test
what is a steel formula
Describe about the Pile test methods, which are used in Industrial & Multistory Buildings in general.
What is Well Point System in Dewatering
what is the meaning of M & 20
Which is quantity of cement in 1 cu.m. concrete of M25 grade
i have a bar of 36 dia in column, what is the lap length?
"Gates of the dams are generally designed of curved shape". Why?
in a building why we are using T beams? why can i adopt beam bottom & Top level as same as slab bottom & Top level?
If we buy crush sand for 3200/ Brass and cement for Rs350 /Bag and flyash 1200 / tonne....and my production is 230 Bricks per bag than how much cost is required for 1 flyash brick?
Tell me about Construction, Contraction and Expansion joints...
2 Answers Modi Builders, SMCC,
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)