Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


can we connect PARALLEL 2 D.G set with different rating??
How ? What is the requirement for this connections?



can we connect PARALLEL 2 D.G set with different rating?? How ? What is the requirement for this ..

Answer / nikhil choudhary

The easiest way to set up a parallel system is to use generators that are exactly alike, or at least have the same output rating. Another flexible approach to backing up your power requirements is to have two or more generators of variable output. In either scenario, these can be connected in parallel with paralleling switchgear to achieve maximum output during peak requirement or the desired minimal output during other times. For parallel operation you have to synchronize all generator units (Voltage, frequency, phase angle).

Is This Answer Correct ?    1 Yes 0 No

Post New Answer

More Electrical Engineering Interview Questions

6 MVA transformer secondary is rated for 725V at no load. The incommer ACB is rated at 690 V, 3200 Amp. Would there be any effect on performance of ACB due to lower voltage rating?

5 Answers  


Why a transformer is rated in kVA and not in kW??

9 Answers  


my question is how to answer the question "you are from b.tech eee background and why do you want to go for banking

0 Answers  


why dc moter are not earthed ????

2 Answers  


voltmeter kya hota hy ?

2 Answers  


We have a bank capacitor rating of 60 KVAR for a overall load of 160 KVA and we have connected three loads of 50KVA each. We would like to auto matically correct PF using APFC. How do we design it?

2 Answers  


what is the effect of leading power factor on Power transformers in existing in major power utility

2 Answers  


phase clearance between phase to phase and earth

11 Answers  


what is the different beetween kva and kwh?

4 Answers  


What is load shedding?

1 Answers  


What can make the the overloads operate when a star delta three phase motor starts?

1 Answers  


Fot testing new star-delta 132 kw motor in electrical worshop.we should check in star or delta connection as we do not have higher capacity cable in worshop?

4 Answers   Adani,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)