How much material is required for constructing a 2 Lane 2Km rigid pavement road
No Answer is Posted For this Question
Be the First to Post Answer
is it correct method to use crush sand in concrete as per is code
what isIS code no for preparation of BAR BENDING SHEDULE (BBS)
rate analysis for shuttering 1:6
define formwork
i have a bar of 36 dia in column, what is the lap length?
what is the exact dia of 8swg and 10swg gabion wire
Deshuttering time for slab 6.15 meter
Test procedure of fly ash bricks as per code ?
what is E <MOE> VALUE FOR WOOD
What is standard sand? What is coarse & fine sand? What is foundation? What is the seze of hooks in various Reinforced section? What is the formula of providing clear cover? What is the basic diff. between working stress & Limit state design? What is &cbc and fck? what are the primary & secondary test of water purification?
beam is fixed at both end which is 8 m span carry udl of 10 kn/m at left half span.there is internal hinge at center.what is reaction at center
how many express way in india
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)