how bridge design is to be start?
what is the preliminary step for design?
which code of practice is to be used for design?
what r the methods used for design?
what r the ivestigation r carried out?
what r the design criteria for design and loading conditions?
Answer / rajkumar
Hi friend,
Designing of bridges goes in following steps:
1) selecting suitable location after sufficient geographic
survey, hydrological survey, geological survey,etc.
2) after selecting the location you have to decide what
type of bride will be suited for ex. steel or arch or RCC
or prestressed, etc. depending upon length of bridge,
geological conditions, purpose etc.
3) once the type is decided then comes the part of load
considerations as under:
* DL, LL, Wind induced Loads, Earthquake induced loads,
hydraulic forces, centrifugal forces if any, upthrust,
stresses due to thermal changes etc etc...
* for this some IRC Specifications are to be followed.
4) after load calculations and various load combinations
the individual members are to be designed.
I hope this answers your question....
for more information look out in text "Bridge Engineering
by S.P.Bindra"....
| Is This Answer Correct ? | 14 Yes | 1 No |
What is the Hardness of M-40 grade concrete, general and theoratical
nitrates more than 45 mg/l in water lead to disease called gastroenterities motteled teeth polio none
Q1) I am having an interview in a construction company for a large sewage project . Since I have not done any such project , there are some queries from my end. Pls. help me to solve them. I will be thankful to you :- a) Normally for large project 400-600 houses & around 1600 peoples , how much dia pipe is used and which type of pipe is used? b) For trenching , I have heard that IS 1200 implies, what are the rules of calculating earthwork in case of depth of 2m or above ? c) To prevent soil to fall when depth of trench is more , what steps are taken and how there qty. is calculated . Like I have heard about timbering . what is this ? d) What are the rules for disposing off the excavated soil ? e) How the pipes that are used are being jointed? f) In case of cleaning on choks , is there any intermediate things provided? g) For foul gases any outlets are provided thru out length of pipeline? h) What is the flow digram like from houses thru small pipe to main pipeline than where main pipeline disposes wastage ? i) Any other thing that has to be kept in mind while calculating earth work for excavation like steps are made and other things? How earthwork is calculated in case of steps ? Pls. explain with a sketch. Regards,
what is the most suitable foundation when construct a bird watching tower in a marshy land
What is the usage of zoom command?
What is the difference between Stress & Strain?
What is ngl level and how it is transfer to column or beam??
Mention different types of roof systems?
How much is anchor length ?
How much wastage we considered for cement
The 4 main factors to start a construction project are––
flow of fluid takes place viscosity compressibilityu surface tension deformation under shear force
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)