What expenses counted in contingencies and how much it is in related to built-up area of the building.
No Answer is Posted For this Question
Be the First to Post Answer
what is coping?
11 Answers GKC Projects Limited GKCPL, Technical Construction, Vijai Electricals,
Why I-section is preferred to channel section?
how much sand requires for Light weight blocks for 100sqft
what is bending moment, for simply supported slab ? how do you calculate ?
How to arrive the co- efficient of all civil activities? For ex:- painting-enamel in wooden doors. co efficient is 1.8. How this is calculated
what is the metal ratio in granular subbase coarse for one cum ? And please explain the morth table ...what is the difference between grading 1 , 2, 3 what it means..plz explain
in staad ,why we realease a moment of a member ? what is affect if we realease a moment
how to do connection between steel beam (I-Section) with R.C.C column??
How much bricks in 1sq.meter with thickness 9inch.
which has high coefficient of discharge venturimeter or orificemeter
HOW MANY CUBES REQUIRED FOR 7 AND 28 DAYS TEST FOR ALL MIX GRADES.
4 Answers Ansals, HFCL, Jaypee, Pratibha Group,
Difference between ton and metric ton
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)