Answer / nadim shaikh
Bar bending schedule needs manual entry or MS Excel as follows in rows
1. sr. no
2. identification (name of member)
3. shape
4. cutting length (as per required by drawing and RCC consultant
5. total cutting length
6. numbers of members (if identical)
7. Dia of bar
8. per running meter weight of the bar multiplied by total running length
9. 8th point will give total weight of that particular member
10. remarks if any by client or consultant
| Is This Answer Correct ? | 3 Yes | 0 No |
what is grade slabs
What is the IS code of Rcc & PCC
What is an object snap mode?
why we leave expansion joint between to complex
How can find weight fosmula in kg/m for circular cylinde steel bar?
what is the difference between pumpable concrete and non pumpable concrete
what is mean by centrifugal force which is act in vehicle on superelevation of road?
how to convert sand from Cum to Brass
What is the difference between Backfilling & Refilling in Earth Work Group Item ?
What is meaning of tlc
How to estimate the shuttering material requirement for a slab and beam and shear wall..? Please send thumbrule to estimate material required ( Plywood, Ms plates, runners, acrospans, jacks)
How much ratio of water in use of 1m.cube r.c.c the ratio is (1:2:4)
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)