how to prepare Steel schedule or Bar bending schedule.
Answer Posted / nadim shaikh
Bar bending schedule needs manual entry or MS Excel as follows in rows
1. sr. no
2. identification (name of member)
3. shape
4. cutting length (as per required by drawing and RCC consultant
5. total cutting length
6. numbers of members (if identical)
7. Dia of bar
8. per running meter weight of the bar multiplied by total running length
9. 8th point will give total weight of that particular member
10. remarks if any by client or consultant
| Is This Answer Correct ? | 3 Yes | 0 No |
Post New Answer View All Answers
On what basis we decide the formation level of the road? other then that of 50% Cutting and 50% Filling??
Scaffolding IS code NO.
What is thumb rule in quantity and cost estimation of a residential building?
WHAT IS YOUR EXPECTED SALARY?
What is diversion tunnel in a dam?
Explain the various stages of the project planning process in construction?
what is meant by sustainable developement as far construction field is considered. Give suitable examples to explain the same
What is meant by a context menu in a cad software?
how to calculate the length diamond shaped striupps in column
if we use 1.25 bag of cement 3 pharma metal and 2 pharma crush sand what is the strenghtexpected for RCC column
Power grids in two adjacent states(A&B) are interconnected. Can power grid in state A can be represented by Thevenin Equivalent Circuit. If not explain Why?
What is the largest concrete dam in the world?
Gidc technical que paper
The foundations are placed below ground level, to increase?
Advantage of Aluminum form work in terms of activities can be skip and cost too