Answer / sisir r prusty, a.e,works dept
it is the ratio of water to cement . Since the quantity of cement is fixed in a particular batch of mix, an increase in quantity of water althouth increases workability but it reduces the strength of concrete & vice-versa.However a lower W/C ratio is recommonded in construction.
| Is This Answer Correct ? | 7 Yes | 2 No |
how to decide cement quantity in 1 m3 concrete
Design an underground tank of internal dimensions 6m x 3m x 3m. The soil surrounding the tank always remains dry. The tank shall be provided with a roof slab. The soil weighs 16000 N/m3 having an angle of repose of 30.
which type of foundation are most prefarable in blockcotton soils
how much % of cement can be replaced by flyash ....
how to decide the mortar ratio 1:4,1:6 in masonry? same in plaster 1:3 and 1:4? which code or any document reference taken to define proportion?
what is the difference between tsp & tower
what is the formula for calculating the cement plastering for a circular water storage tank.?plz help me thank you aamirabdulsalam@gmail.com
Basic questions of civil engineering
0 Answers ONGC, RB Construction,
How many nos. are Contains fly ash Brick in one Cubic meter ?
why demand factor less then 1 ?
How to Calculate in measurement RCC Colo um Spred design for Billing
what is the difference between onw way slab & two way slab?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)