Why compressive strength of only concrete cubes and cylinders tested ? why not other shapes?
Answer Posted / kosy
There are based on research which lead to establishing standards such ASTM,..
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Explain what are the problems one might face while having a Cantilever balcony?
I need to constructive work in amaraj batteries
At one time what is the height of Lift for concreting for Bridge Piers Class B Loading and refer the code.
If we have the center line of the Finnish road level and we want to know what level of pay would have offset the Lhs and Rhus RHS 1,2.5,5 1,2.5,5 m.
what is the water-cement ratio of mix design while 30mpa in 7 days?
estimate quanitity of bricks(19x9x9cm without mortar), cement & sand in 10feet X 10feet wall ?
How to get MEP technical,instaaltion & testing data for interview?
what is modular brick and it size
how to take the quantity of block work and plastering 1block price:3saudi riyal cement:1bag:15 saudi riyal sand:3bag:20 saudi riyal 1mason:9hour per hour 40 saudi riyal 1labour:9hour per hour 40 saudi riyal can anybdy calculate
Explain the various stages of the project planning process in construction?
TELL US ABOUT A TIME WHEN YOU FAILED TO MEET A DEAD LINE. WHAT WERE THE REPERCUSSIONS?
What is passive earth pressure ?
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
How to calculate construction cost of residential building in mumbai
How to calculate cement, water, fly ash amount for 1 cum if the w/c ratio is 0.4 and fly ash to cement ratio is 1:9