Why double earthing is required ?
Answer / rajkumar
because any one of the earth probelem anothher one connected to gnd
| Is This Answer Correct ? | 1 Yes | 1 No |
sir please tel me how calucalte kwh if home taken load 30ams how maney kwh taken per day.and 3phase motor 5hp per hars how maney load teken and how mach kwh and forward me to electrical table for calicalte kwh and kvr and kvah
What is the resonant peak?
what is the roll of power factor in induction motor.
WHAT IS THE USE OF ANTIPUMPING CONTACTOR IN HT BREAKERS
What will happen if the oil level in the buchholz realy of a transformer gets down?
How do we calculate over and under frequency tolerance from generator data?
can we share mvar in parrelell connected alternators
How do you select a cable size(cu&Al)for a particular load?
I want definition for ABT Meter (Availability Based tariff) ?
0 Answers Radha Regent Hotels,
In case of 11kV dual delta bank what are the recommended protections with specific CT / VT requirements? The capacitor bank is to be connected to the main 11kV switchgear from where the H.V.Motors and auxiliary 440V loads.
Why we use DC for charging of Batteries??Why not AC Supply???
Why the frequency of ac in india is 50 hz but in some other countries it is 60 hz.
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)