If breaker is undefined position, first step to do.
No Answer is Posted For this Question
Be the First to Post Answer
How many earthings are required for commissioning the Transformer?
i am working in a grid substation,TNEB having 13 yrs experience. Am I eligble to get apply for c licence now?
When one of three series resistors is removed from a circuit and the circuit is reconnected, the current
Why are lt windings placed near the core?
we have 3 phase 4 wire supply 230/415 V.AC and our distribution is single phase or we have all single phase 220 v,ac operated appliances. and noted the current with help of clamp meter Red to N = 20 Amps. Yellow to N = 45Amps and Blue to N = 30 Amps ( total is 95 Amps ) what will be neutral current on the main .
Difference between rating factor of cable and derating factor of cable?
When charging a 20 MVA , 33kV/6.6kV transformer through regulated (0-6.6 kV or 0-33 kV) source on no load , what will be the maximum current drawn by transformer from source and what sould be the source capacity.
Brief working principle of stabilizer,application & safety precautions
Define sensitivity?
What is the purpose of shunt trip in ACB function?
Difference between ac parallel circuit and ac series circuit?
What is contract demand in solar system?