What should be the lap length in raft if height of raft is 0.800mm ...it couldn't b 50D or 40D...we just have to join upper and bottom reinforced...is there any formula for determine it...
No Answer is Posted For this Question
Be the First to Post Answer
sir tell me the formula for calculating the volume of 380mm dia double under reamed pile of 4.0 mts depth.
what is a steel formula
Is 456 revised lastly in which year? & What are the revisions?
what are the various types of pile foundation? explain with introduction
What will be weight of 0.5mm GI sheet per sq.ft?
Normally in slabs, steel quantity is not added when you calculating concrete quantity for that slab, why it is not added ?
for preparing 10cum of 1:4:8 cement concrete the requirement of sand is 0.7cum 2.8cum 4.74cum 18.40cum & how
what is the ratio of steel and concrete to use in slabs , beams, columns ?
Percentage of wastage of cement ? Please mention IS code and clause from where I get it.
within an emergency scenario what are the safe systems of work a coss can setup as part of is duties
Coverage of 25mm.thick ratio of 1:4 cement mortar?
how to calculate stair case landing slab bottom shuttering marking,angle of stair case? top landing length-1250mm treads length-2700mm(9X300mm) rise length-1500mm(10X150mm top landing level +1.5m lvl bottom level-0.00m lvl
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)