will fix foundation bolts at site with out template is
there any procedure?
No Answer is Posted For this Question
Be the First to Post Answer
Trapezoidal footing length = 2m , B=1.7m D=0.5m and d- 0.15m. Can anybody help and calculate quantity of concrete by explaining all formulas involved.
19 Answers DNA Infrastructure, HCC, L&T,
What is construction mitigation management?
1- what is steel rebar cover? 2- what is a rebar stirrup?
Define What is the tensile strength of wood?
What is critical path method (c.p.m)?
1cracks found in brick wall in service building, how to rectify it,with low cost ? how to find propagation of cracks (in depthwise) and arrest on that stage? Is it require to design for Expansion joint in Brick work? if so what is the required distaces?
Plz tell me...column and wall section drawing.
VAT and CST ? Which benefits for buyer ? Why benefits?
Steel calculation formala for column,beam and slab.
what is the bar bending schdule
what is meant by point of contraflexure?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?