how much quantity of water is required for main wall brick work, partition wall brick work,and for internal and external plastering and how it is calculated?
Answer / vinay
if they give the give w/c ratio then we can calculate water quantity.
for eg if 0.3 is the w/c ratio then,
w/c=0.3
then 1 bag of cement contains 1.25cft so, 0.3*1.25= 0.375cft
1cft contains 28.34 litrs of water then 0.375*28.34=10.625 litres of water is required for 1 bag of cement, generally here for dry volume of concrete is taken as 1 and half times the wet volume i.e 1.54
| Is This Answer Correct ? | 1 Yes | 0 No |
WHAT IS THE MELTING POINT OF STEEL?
What is Base Shear ?
Why we used ther red bricks for construction..
14. List 3 of your strongest points as a worker?
What is allowable limit of silt in river sand for concrete
how do we find the nos of bricks in 1 m3 brick masonary
What is the difference between 53 grade and 43 grade cement
what is your role of in previous company as a construction manager
is there any books available to know the methodology of construction process ( Site Process ) and also find the quantities of all materials used at site.
how much shouid be the rate for ready mix concrete per cubic meter
What are advancements in civil engineering?
What is the cutting length formula of tringle ring?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)