Golgappa.net | Golgappa.org | BagIndia.net | BodyIndia.Com | CabIndia.net | CarsBikes.net | CarsBikes.org | CashIndia.net | ConsumerIndia.net | CookingIndia.net | DataIndia.net | DealIndia.net | EmailIndia.net | FirstTablet.com | FirstTourist.com | ForsaleIndia.net | IndiaBody.Com | IndiaCab.net | IndiaCash.net | IndiaModel.net | KidForum.net | OfficeIndia.net | PaysIndia.com | RestaurantIndia.net | RestaurantsIndia.net | SaleForum.net | SellForum.net | SoldIndia.com | StarIndia.net | TomatoCab.com | TomatoCabs.com | TownIndia.com
Interested to Buy Any Domain ? << Click Here >> for more details...


how to convert udl into point load??



how to convert udl into point load??..

Answer / asif

by multiplying the uld with total span of the beam i.e for example udl is 2 kip/ ft & beam span is 30ft .then 2*30 =60 kips & it will act at centre i.e 15ft from both of the supports

Is This Answer Correct ?    35 Yes 3 No

Post New Answer

More Civil Engineering Interview Questions

5. Two long boundary walls run parallel to each other at a center to center distance of 1 meter apart. The width and height of the first wall are 0.30 m and 2.5m respectively. While those of the second are respectively 0.18m and 3.5m. Plot the distribution of vertical stress intensity due to walls on a horizontal plane, 1m below ground level. The walls have negligible depth of foundation and are made of brick masonry (y = 19.2 kN/m cu)

0 Answers   KIOCL,


How to calculate concrete,s cement, sand, metal on the bases of its ratio. For any volume of work please give me brief calculation

5 Answers   L&T,


How Can You Design Aisolated Footing Subjected To Tenstion Force?

0 Answers  


what is education Cess.

0 Answers  


How t find the quantity of materials required for construction of a wall of length 10x5x0.2

2 Answers   NCC,


why is the column design?

0 Answers  


how many minimum admixtures are used in water froofing structures

0 Answers   IVRCL, Rooftek,


What is proportion of M25,M30,M35,M40 IN TH FORM 1,2,3,4?

12 Answers   L&T,


what is the load bearing capacity of the scafolding pipe (50mm) and other.

3 Answers   Gammon, IVRCL, L&T,


number of standard bricks need 1 cubic meter

9 Answers  


What is the veriplus for ellips card length formula (major axis 3.4m,minar axis 2.6m spacing 0.2m

0 Answers  


what is mcArther pile?

1 Answers   Kerala Public Service Commission,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5086)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4456)
  • Electrical Engineering Interview Questions Electrical Engineering (16639)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)