Brick work how many days curing and at any concreting pl
Answer Posted / dileep naik
It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
The largest size of paper used in plotter to print the drawing made by Autocad .
How can i do RCC rate analysis?
what is the use if we fixed butterfly ties in column and masonry work joint?....where we have to fix(distance)..
what is kribs is supporting?
What is structural frames or systems?
What is different between DI Pipe and CI pipe?
CAST EFFECTIVE WATER SUMP CONSTRUCTION DETAIL
What is packing Factor ?
How can we calculate 8- storied Madrasha Building pile capacity by taking SPT value at site?
Why is the statue of liberty made of copper?
What is c.g.i sheet which used for roof??
What is a kip?
do you think we shall remove un wanted soil for foundation excavation even if the thickness of the soil strata is more than 8m ?
Which stone is best for wall construction Laterite Stone or Cement Blocks
How to arrive dry volume of concrete (1.52 to 1.57) ?