Brick work how many days curing and at any concreting pl
Answer Posted / dileep naik
It is depending upon weather condition.
Generally Brick & concrete work cured atleast 7days.
| Is This Answer Correct ? | 3 Yes | 1 No |
Post New Answer View All Answers
How can i display 5 asterisk and another 5 asterisk )?
What is the tensile strength of marble?
To pcc 11 ft x 24 ft .How many bags of cement, sand and aggregate required? And for roofing how many cgi sheets required?
how many spacers we need for 1 ton reinforcement? aprox.
What is meant by solid geometry?
can any one give me sample question paper of BHEL at mdansari86@gmail.com as i m appearing for the same exam.
How did the romans get water up hills using aqua ducts?
What are the reasons for geotechnical site investigations in uganda?
How to plan a project
in levelling operation the first site on any change point is back site the second site on any change point is fore site the line commenses with fore sight & closes with backsight the line comensses with back sight & closes with fore sigh
Difference between lime, distemper and plastic emulsion?
What is geopolymer based concrete?
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
How do we test on design and style in a software?
how much need sand and cement for 1 cft roof construction?