can we go for short rcc column without any steel rienfocement
carrying truely axial load only???(No other load acting on it
such as wind load,earthquake & lateral earth pressure)

Answers were Sorted based on User's Feedback



can we go for short rcc column without any steel rienfocement carrying truely axial load only???(N..

Answer / kumar

first u r question wrong
can we go for short rcc column without any steel reinforcement
rcc means reinforced cement concrete, with out
reinforcement means point less Question.

i Will Tell You Answer

Can Go, But up to curtain compressive load.

Is This Answer Correct ?    8 Yes 0 No

can we go for short rcc column without any steel rienfocement carrying truely axial load only???(N..

Answer / shekhar257

No,it will fail by crushing due to compressive load owing
to its shorter size.

Is This Answer Correct ?    4 Yes 6 No

Post New Answer

More Civil Engineering Interview Questions

Please tell me about surveying standard chain details.Thanks.

1 Answers  


what is the ratio of m50 grade in concrete block

1 Answers  


Stringer How many cm goes to landind

0 Answers   ACC,


how amny bricks of size 240 mm X 120 mm X70 mm are required in 100 cubic meter brickwork. How much cement is required at 10 mm masonry and at 4:1 sand cement ratio and how much cubic meter of sand is required for the above work.

2 Answers   Cube Construction,


what a pigment?

1 Answers  






Which of the following armed forces has decided ( in August 2016) to appoint P V Sindhu ( Olympic silver medalist) as its brand ambassador? A) ITBP B) CRPF C) NSG D) CISF

1 Answers   HPSSSB,


Cement Co-eff. in block 1:6, brick1:4 work?

2 Answers  


When was the first motorway built in england?

0 Answers  


what is escalation?how it is done?

0 Answers   Vishal Nirmiti,


what is the cost difference of a same structure when it is constructed with brick masonary and when it is constructed with block masonary and concrete as a frame structure????????????????????????

0 Answers  


Outline ten different ways in which typical bill of quantities can be used?

1 Answers  


Management diagram of your project is–––

1 Answers  


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)