Brick work how many days curing and at any concreting pl
Answer Posted / abdul aziz
Concrete 7 day 21 days depend on weather or no need curing use thermal blanket for self curing or curing compound chemicals
Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
Pile height is 4.3m. 2nos. under reammer. bulb nose is 75mm and height is 400mm. pile dia is 375mm and overall dia 940mm.pls. help to calculate concrete in pile and bulbs separately. What is formula for bulb volume calculation ?
Which are the top apps for you civil engineering?
Define What are the uses of Groynes?
how do we design mix ratio?
Need help in designing a degasser tower for 2m3/hr DM plant, also send me the formulae used
what is a well
mean of NH4 pipe
How to estabilish reinforcement Steel rolling margin for a building projects ?
What is the use of extruded feature in solidsworks?
Consumption of Binding wire for fixing of cover block in vertical surface
Define What are the uses of alloys in daily life and how are alloys made?
What is kn measurement?
what is the sequence of the activities in the typical under ground water tank including civil & MEP works.
what is the weight of 10mm,20mm,40mm aggregate
Why is the use of granular sub-base in concrete carriageways not preferred, explain?