on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf  has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure? 

Answers were Sorted based on User's Feedback



on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oi..

Answer / dheeraj.yadav

It may be cause due to meter internally circuit open the secondary of ct in meter.due to circuit problem.

Is This Answer Correct ?    0 Yes 0 No

on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oi..

Answer / k.prakashchandra

Lightning stroke or metering core open circuited due to operation of faulty rotary phase selector

Is This Answer Correct ?    0 Yes 1 No

Post New Answer

More Electrical Engineering Interview Questions

Why transformer rating in KVA? describe.

5 Answers  


Difference between on line capacitor and Station type capacitor.

1 Answers  


whay is snubber circuit , why we are using snubber circuit in thyristor

1 Answers   NEPC,


In power plant synchronizing time (synchroniging meter should be 12'o clock position only. why not 6'o clock position not possible.

1 Answers   ITC Infotech,


When i went to a interview the interviewer ask me a question for that i cant able to answer him if anyone knows answer me How will you design a capacitor bank for a plant? if my p.f is 0.6 i have to improve it to 0.9 or 1 what kind of steps i have to do? and is there any formula for calculating this?

6 Answers   APNPDCL,






CALCULATE THE TOTAL VOLTAGE DROP AND SELECT THE CABLE SIZE IN MM-SQARE FOR A PANEL-262KW AT 110 METER FROM THE SOURCE SUPPLY , SUPPLY VOLTAGE 240/415

0 Answers   DEWA, Growth,


how to discharge 3 phase power factor correction capacitors

0 Answers   M S Ramaiah Institute,


why two over current realy used in vcb.

2 Answers   BSES, Wipro,


what is the IEC standard for Power Cable installation in onshore (like in direct buried ground or above groung)

0 Answers   L&T,


The synchronous machine excitation system explain

0 Answers  


Please explain me about Relay curves and their sources to read ?

0 Answers  


Why ACB is used in LT why not in HT and why VCB is used in HT why not in LT

1 Answers   GE,


Categories
  • Civil Engineering Interview Questions Civil Engineering (5085)
  • Mechanical Engineering Interview Questions Mechanical Engineering (4451)
  • Electrical Engineering Interview Questions Electrical Engineering (16632)
  • Electronics Communications Interview Questions Electronics Communications (3918)
  • Chemical Engineering Interview Questions Chemical Engineering (1095)
  • Aeronautical Engineering Interview Questions Aeronautical Engineering (239)
  • Bio Engineering Interview Questions Bio Engineering (96)
  • Metallurgy Interview Questions Metallurgy (361)
  • Industrial Engineering Interview Questions Industrial Engineering (259)
  • Instrumentation Interview Questions Instrumentation (3014)
  • Automobile Engineering Interview Questions Automobile Engineering (332)
  • Mechatronics Engineering Interview Questions Mechatronics Engineering (97)
  • Marine Engineering Interview Questions Marine Engineering (124)
  • Power Plant Engineering Interview Questions Power Plant Engineering (172)
  • Textile Engineering Interview Questions Textile Engineering (575)
  • Production Engineering Interview Questions Production Engineering (25)
  • Satellite Systems Engineering Interview Questions Satellite Systems Engineering (106)
  • Engineering AllOther Interview Questions Engineering AllOther (1379)