on 22.03.2015 at 17:15hrs Y phase 66kV class Power Trf-2 Current transformer has flashed over and oil came out. The failed CT has been replaced on 24.03.2015 at 13:15hrs and the Trf has been charged in presence of RT Hassan after conducting the pre-commissioning tests. On the same day at 17:00hrs the commissioned CT has again flashed over and immediately the Trf has been isolated from power supply. It is confirmed the secondary is not opened and checked the earth integrity and is found ok. Here what would be the reason for the CT failure?
Answer Posted / k.prakashchandra
Lightning stroke or metering core open circuited due to operation of faulty rotary phase selector
| Is This Answer Correct ? | 0 Yes | 1 No |
Post New Answer View All Answers
Define newton's law of viscosity.
what is meant by re-rolling motor? how it differs from standard motor?
why we testing the core balance of the transformer before comissioning?
why we not used 11kva as a direct our electrnics component.
What is the form name of 'c' license, I want to download in web
What is EHT tariff or Power factor Tariff ????
how the synchronizing is obtained at bus couplers in grid substation? (because there we cannot change the frequency in one of transmission lines like in generator synchronization)
we have one oven for 12 zone we are installed ir lamp in oven we control load from thyrister and 0 to 5vdc so our zone no 8 getting bright in fraction of second so what we do.. Please answer
what is p.s impedance measurement test in earthing transformer?
What is the rate of WCT on the Electrical Contracts comprising of DG Sets and Civil Works in Delhi ?
WHAT IS VCB SAFETY
What is the use of bundle conductors?
how to calculate cooling requirement of datacentre from electrical load?
what is W.T?specify the acceptable range?
What is the use for cable entry in control room?