Answer Posted / rama subramanian
1 Unit = 100 cft
1 Unit = 100 Cft/(3.28084*3.28084*3.28084) =2.832Cu.m (Note :1ft =
1 unit = 100 Cft *(30.48*30.48*30.48) = 2831635Cu.cm
Note :1 ft = 30.48Cm & 0.3048m
| Is This Answer Correct ? | 0 Yes | 0 No |
Post New Answer View All Answers
With reference to construction of state highways, please let me know the total Bill Of Quantities as per the following details:- 1) Subgrade - 500 mm 2) Granular Sub-Base (GSB) - 200 mm 3) Wet Mix Macadam I (WMM I) - 150 mm 4) Wet Mix Macadam II (WMM II) - 100 mm 5) Dense Bituminous Macadam (DBM) - 60 mm 6) Bituminous Crust (BC) - 40 mm Road Length is 44 Kms. Road Width is 7 mtrs. Please provide the BOQ of each layer as per Compacted Factor & Loose Factor both. Also, if possible please provide me the approximate details of total material required (all categories viz. soil, gravel, stone aggregrate, sand, bitumen etc.) as per general mix design prevailing in India. Thanks & Regards -- Rokr
what is the price of a cubic meter of concrete on international market?
What is the number of IS code of practice to be followed for hydraulic design of sewerage pipe line?
How to fix the reinforcement in footing shorter bar at bottom and longer fix at top.
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
Consumption of Binding wire for fixing of cover block in vertical surface
What is diversion tunnel in a dam?
List out the types of roofs?
how much concrete solid/hollow block are manufacture per 50 kg cement bag in differnent sizes like 400x200x200mm, 400x200x150mm, 400x200x100mm. And need proper ratio as per sale quantity. pls send my mail mathi7599@gmail.com searching last two years not yet get pls find and enclosed pls. need practical analysis.
How much of fly ash is allowable in Portland cement and what is the disadvantage when the level of fly ash is increased?
i am laying a base of dimensions 6.5feet by 7feet by 1.25 feet depth how many bags of 25kg cement and how many bags of 25kg sand will i need
what does the track parameter mean in staad.pro?
how to calculate mivan shuttering matrial
how can we construct building without foundation providing only grade beam at ground level
1.Why we are preferring 43 grade cement than 53 grade cement. 2. Approximate cost difference between 43 and 53 grade cement. Thanks.