In pile foundation which kind of action are take place?
Answers were Sorted based on User's Feedback
Answer / romy som
end bearing action & skin frictions are simultaneously act
on the pile.
| Is This Answer Correct ? | 17 Yes | 1 No |
while doing the structural works of a simple ground+1 villa, can the columns be continued immediately after neck columns without tie beam, while the tie beam to be done after columns concreting.
Requirement of cement, and steel 1:2:4 ratio concrete in 1128 Sqft area(Cement No of bags, steel in Kgs)
How to calculate quantity of plum masonry in 1:3:7
what is stub column ?
which type of binding wire gauge using gulf countries
state the difference between direct and indirect cold water supply scheme
why bent up bars in slab provided in alternate manner and not continuos ?
WHERE CAN I GET THE PREVIOUS QUESTION PAPERS OF APGENCO FOR THE THE POST OF Tr.ASSISTANT ENGINEER(CIVIL)
8mm.2l@7" c/c in footing column drawing,mean of 2l,4l in the Column drawing please answer give with example,thankyou,
How we paste the Granite Slabs at External Wall?Is there any chemical compound material was using?
about higyway engineering
2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;2+2=?;
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)