How to calculate the sand and aggregate in concrete
Answers were Sorted based on User's Feedback
Answer / muhammad azam
for example concrete ratio 1:2:4
volume or dry conrete=1.54
sum of ratio=1+2+4=7
cement=1/7 *1.54=0.219
sand=2/7 *1.54=0.439
aggregate=4/7*1.54=0.879
Is This Answer Correct ? | 3 Yes | 0 No |
Answer / manzar
For example M15=1:2:4
Sum of ratio=1+2+4=7
Consider volume=2 cu.m wet volume
Dray volume=wet volume+54%wet volume=2+54/100*2=3.08 cubic meter
Cement=3.08*1/7*1440=633.3kg
Sand=3.08*2/7*35.31=31.07 cft
Aggregate=3.08*4/7*35.31=62.14cft
Is This Answer Correct ? | 0 Yes | 0 No |
Answer / naresh babu
for example M15 = 1:2:4
volume of wet cement concrete =1.54 to1.57m^3
so cement =1/1.57=0.63
sand= 2/1.57=1.27
concrete =4/1.57=2.54
Is This Answer Correct ? | 2 Yes | 21 No |
what should be the quantity of water in m20 cocnrete /per bag cement-- whats the formula
What are the dimensions of 1)Standard Brick 2)Nominal Brick What is the difference between them in terms of use ?
49 Answers ASF, Grasim, HSS BIM, JPSC Jharkhand Public Service Commission, L&T, NCC, RNA, SEW Infrastructure, Simplex, TCE,
Explain different types of rcc pipes.
What is Base Shear ?
what is assumption consumption of steel per m3 for raft
what is meant by structural design?
what are the strenth of 1cum brick work
how to calculate round stirrups.
4 Answers Infinity Engineering,
Explain what is alternate bid?
Pl answer. when we deduct 2d for cutting length of 90deg bend, whats the method of booking measurements as per IS code? whether cutting Length to be booked or something else?
How can we calculate the no.of bricks per sq.mr?
3 Answers GTL, Real, Sahyadri,
what is the minimum cement content for M20 & M25 as per is code -456(2000).