What us meant by DLP & liquidated damages in civil quantity surveying
Answer / sreekumar
DLP MEANS :DEFECTS LIABILITY PERIOD (Certificate)"
Normally it will count from the completion of the project up to 365 days as per the FIDIC. In between these period, contractor need to rectify all the maintenance and other damages. after the DLP the Consultant will be provided the Defects Liability Certificate. Then the contract can submit the Final Statement to the consultant/client for getting there 5% retention money.
Is This Answer Correct ? | 3 Yes | 1 No |
Brick size ? & 1 square feet brick work for use brick
what is the proportion of m20 grde concrete? also how much water is required for this proportions? As there were any formula for water-quantity?
how many kg sand is requried for plastring in 100 sqft?
what is ph value of water
how to check aggregate quantity in stock yard
Which prize is the alternative to the NOVEL Prize?
in which measurment pitot tube is used
What is absolute coordinates?
WHAT IS DIFFERANCE BETWEN TOR STEEL AND TMT STEEL
What is the difference in design between Working Stress method & Limit State Method ? Briefly Explain.
How much quantity a carpenter can do in a day
What are the standard plastic limit/liquid limit/plasticityindex for differrent type of soils?