while measuring slab for concrete Quantity it is practiced
that
steel quantity is not deducted in that particular qty.why?
No Answer is Posted For this Question
Be the First to Post Answer
one cricket ball through in chennai and jaipur same speed where bowl has fast speed
What happens to Load at yielding ?
can u plz send me ntpc placement papers(civil engineering) at mohit_verma21@yahoo.com
what is the used civil engg?
How to decide/consider the grade of bitumen for dbm.
1 cft of brickwork 1:6 mortar ratio need 12 numbers of bricks so find the quantity of sand and number of cement bags
In case of a beam ,main steel is provided along the longer span because, bending moment is directly proportional to length but why in case of one way slab main steel is provided along shorter span while as bending takes place along longer span?comment
1 what is the nature of your job? 2 what major product or service does your company offer? 3 hoiw does the knoledge of chemistry hels in your job?
What are the types of Road in India?
Allowable wastage for ready mix concrete?
What is Refuse Area ? And What is Definition ?
Cement proportion in Fly ash bricks and type of cement to be used ?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)