what is 43 & 53 in cement
Answers were Sorted based on User's Feedback
Answer / shakti
It is the grade of the cement i.e,it implies that the
strength of cement achieved after 28 days of curing will be
43mpa & 53mpa respectively.
| Is This Answer Correct ? | 59 Yes | 1 No |
Answer / pinakin
Characteristic compressive strength after 28 days
| Is This Answer Correct ? | 13 Yes | 2 No |
Answer / n.rajeev
That is grade of cement. like how we speak concrete grade.
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / madhu sudhan reddy
ITS REFER THE MINIMUM COMPRESSIVE STRENGTH OF THE CEMENT AFTER CURING THE 28 DAYS AT NORMAL TEMPERATURE....
| Is This Answer Correct ? | 1 Yes | 0 No |
Answer / emdadul haque
The number (43&53) to the specified Characteristic
compressive strength of 150mm size cube at 28 days,
expressed in N/sqmm.
| Is This Answer Correct ? | 7 Yes | 7 No |
Answer / munish neb
43 & 53 grade has no relation to its compressive strength. These grade gives the fineness modulus of the cement. More finer cement ,it settle early and have hydration of heat is more that's why 53 grade need more curing than 43 grade. After 28 days, the strength of the all grade cement is same.
| Is This Answer Correct ? | 2 Yes | 4 No |
Answer / mitraj
53 grade cement produce more heat of hydration then
43...henc its not good then 43 grade......
| Is This Answer Correct ? | 0 Yes | 3 No |
Pls help me to arrive the rates for centering shuttering for highbay using H-frames?
TWO EXAMPLES OF NET WORT REVENUES FROM BUILDING CONSTRUCTION
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
how much 20 mm metal is used in M25 grade desin mix in weight and sand for 1 cubic metre
How many Rod required for 58 feet by 24 feet roof slab which is supported by 5 * 3 = 15 Column. Six Stored building Roof Slab = ? Ton 15 Column = ? Ton Slab Beam = ? Ton
how to absorb to site basic corrections? which are the important correction?
Please provide detail I.S standard code for using crush sand instead of river sand for plaster and concrete grade M15, M20, M25 and M30 and its mix design
1 Answers JPMorgan Chase, Sobha Developers, Structwel,
How Much the Lean concrete Density?
0 Answers Techno Unique Infratech,
Isolated square footing quantity calculations
How many required steel of 1m3 slab casting?
I'm preparing to to build a simple house, but i don't know how to calculate how much cement, gravel and sand and hollow blocks i need to prepare. How many pcs of 4" or 6" hollow blocks I need for my planned 3mx6m house? thanks.
What should be the maximum allowable time for placing ready mix concrete? The specification requires concrete placement within 90 minutes of batching at the plant. What is the significance of this 90 minutes & should this be used as a rejection criterion? What effects does the concrete has after that time period?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)