Can rice husk ash be used instead of coal fly ash for manufacture of clc/
foam concrete
No Answer is Posted For this Question
Be the First to Post Answer
9*9 1:4:8 ratio using for p cc work please tell quantity 40mm aggregate ,sand &cement
Why did you choose to communicate with our organization ?
What is standard sand? What is coarse & fine sand? What is foundation? What is the seze of hooks in various Reinforced section? What is the formula of providing clear cover? What is the basic diff. between working stress & Limit state design? What is &cbc and fck? what are the primary & secondary test of water purification?
why are use steel with conc. instead use of other type materials.
4 Answers College School Exams Tests, Prathima Group,
How Much span required for 1 sqm of shuttering(Beam & Slab)
Basic questions of civil engineering
0 Answers ONGC, RB Construction,
how to calculate the quantity of steel used for construction..
my client's 10 year old building have been affected by the neighbor new building construction with out set back.Old building cantilever bldg hanged by 3". It is supported by introducing 2 rcc columns & beams.Now how to conceal the cracks?
How to hide dimensions in autocad?
describe about Hollow bricks? where the hollow brick "ll use& what"s the purpose?
what is pouring and explain
what are the volumes of soil stabilization mix of cement,lime and sand in the ratio of 1:1:10 respectively in 1m3?
Civil Engineering (5086)
Mechanical Engineering (4453)
Electrical Engineering (16638)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)