what is the diffrence of opc and ppc cement ? expailn
Answers were Sorted based on User's Feedback
Answer / matu singh chauhan
OPC-ordianry portland cement
OPC-opc is obtained by adding raw materials like calcareous
materials and argillaceous materials
PPC-portland pozzolona cement
PPC-ppcis obtainedby adding pozzolonac materials like
fly ,pumicities,volcanic,ashes,shalestuffs,etc.
| Is This Answer Correct ? | 34 Yes | 2 No |
Answer / ajaya kumar rana
OPC stands for ordinary Portland cement.these are
traditional cements obtained by proper grinding & processing
of argillaceous & calcareous materials in rotary kiln.
PPC stands for portland pozzolana cement.Portland Pozzolana
Cement is manufactured by blending pozzolanic materials, OPC
clinker, and gypsum either grinding them together or
separately. Today Portland Pozzolana Cement is widely in
demand for industrial and residential buildings, roads,
dams, and machine foundations.
| Is This Answer Correct ? | 27 Yes | 5 No |
Answer / lokesh
opc is mainly used for mixture with the concrete only
ppc is mainly used for mixture with the brikes only
because the ppc when only adding some water day by day then
only it will strongs at the same time Opc had more
powerfull than ppc sychronising thier molecules as closer
it was only bares by the concreet only if ppc used for
concreeet it will reqire more water if not the pole may
have some holes ....
| Is This Answer Correct ? | 8 Yes | 1 No |
Answer / s k jha
PPC is widely used instead of OPC to avoid cracks developed
due to temperature variation.But, also to be noted that
setting time of PPC is more than OPC, therfore for
hydration and dehydration proces of concrete more and more
water is required.Since ppc takes more setting time
therfore internal molecules may colesces together to make a
firm bond between the particles and that is the reason
cracks not appears after proper curing.
| Is This Answer Correct ? | 9 Yes | 2 No |
Answer / ds raju
OPC is generally used for concrete where less quantity is
there in single pour.
PPC is generally used in mass concrete pours like
Dams,Heavy Equipment foundations, etc.
| Is This Answer Correct ? | 13 Yes | 7 No |
how to do rate analysis for P.C.C 1:4:8 for 2.83cum(100cft)
2 Answers Unity Infraprojects,
How to calculate the cement, sand quantity for plastering? (10'x10')10mm thick ratio 1:5. wht"s the formula?
35 Answers Adarsh Developers, Amrapali, Ganesan Builders, MAHINDRA, NCC, Olympia Infratech, Omex, Ozone Group, Papni Associates, Perfect Arts, PPEC, Raj Construction, Ramky, Skyline Builders, VRR Builders & Developers,
yet i am not got any hallticket from aai junior excequtive exam.any one got application form from aai.
2 Answers AAI Airports Authority Of India,
how much the ratio of the m15, m25 .......etc
We are into industrial flooring (epoxy flooring) business. We buy material from manufacturers.We supply and laying the to companies. In our billing what tax/ taxes to be claimed from companies? Are we applicable for only WCT or any else?
pls tell me , what is the density of cement when normal packed
How to calculate plastering for elevated water storage tank
mix design of concrete using indian standard methods
how to calculate the density for high density concrete ? or is it same as the density of RC?
what is the percentage of binding wire required for 1 mt of steel binding in gerally
weight of 32mm rod/m
what is the difference between linear and curved elements?
Civil Engineering (5086)
Mechanical Engineering (4456)
Electrical Engineering (16639)
Electronics Communications (3918)
Chemical Engineering (1095)
Aeronautical Engineering (239)
Bio Engineering (96)
Metallurgy (361)
Industrial Engineering (259)
Instrumentation (3014)
Automobile Engineering (332)
Mechatronics Engineering (97)
Marine Engineering (124)
Power Plant Engineering (172)
Textile Engineering (575)
Production Engineering (25)
Satellite Systems Engineering (106)
Engineering AllOther (1379)