What is the maximum allowable wastage in pouring of Ready Mix Concrete received at location with transit mixtures. Work scope includes both Direct Pouring & manual pouring.
Answer / nadim shaikh
6% to 10%
also depends upon stacking of materials
Is This Answer Correct ? | 1 Yes | 2 No |
How many types of slabs are there & how to design it?
component parts of a weir
4 Answers Infosys, L&T, Zamil Steel,
What is the size of your cube mould
to achieve the strength upto m-65 concrete what we should add a)more cement b)silica fume c)marecement with fly ash d)flyash
how to determine pile length and diameter of pile is there any thumb rule?
what is the difference between weir and a barrage
12 Answers AAI Airports Authority Of India, CIT, TCI Constructions,
How much cement and sand are required for 1 square feet of plaster at a thickness of 15 mm at a ratio of 1:4?
plz answer the questions, How do you check the quality of foundation? and What is the key performance area in quantity survey?
how to do cementicious paint for rcc walls of cw pump house
RCC MEANS
I need model question papers for writing the Dubai municipality exam,for G+1
what is plate load test??