how to decide the column size and dia of the bar
Answer Posted / imran khan
BY LOAD AND BUDGET
Is This Answer Correct ? | 4 Yes | 12 No |
Post New Answer View All Answers
how clculate excavated or backfilling quantity by simpson's rule
can we find any technical issue if we are gong to change the dimensions of steel beams from one type to another type IE if there are any equievelant data base to find solution for problem of changeing sectios of beam from one type to another with the same cross sectional area.
Actually i am confused that how to calculate the bending moment for a semi-circular beam and curved slab.If any one have a good idea about the matter,please give the answer with a suitable example. Thank you......
how to Concrete cubes testing curing time 7 days casting date 24.05.17 testing date ?
quantity of material needed for rubble stone masonry for 1:4 and 1:6
Give me an example of a time when something you tried to accomplish and failed.
150mm bricks size how many use 4.14 m3
Journal entry Gross salary 10000 Tax 1000 Employee contribution 2000 Employer contribution 2000
How much permissible bearing capacity requires for open footings(isolated) and what type pile foundatuon prefering for coastal areas?
what is idealized curve for concrere and steel
What is the basic difference between OPC
What is geopolymer based concrete?
what is the difference between tsp & tower
Can we weld hot rolled steel ASTM A615 ? Please Give the detail answer please thanks alot
material required for construction of 1cu.mtr wall (Cement, No of bricks (Brick size 40cm x 20cm x 10cm),sand,Quantity of water