how to take concrete quantity for precast segment for
viaduct project?
No Answer is Posted For this Question
Be the First to Post Answer
What are the main reasons for conducting pull-out tests for soil nails?
how many BSCs can i connect to the HUAWEI MSC
How Can Calculate Plastering Quantities For 260.04 square meter by using CM 1:4 with 25mm Thick ?
DESIGN PROCEDURES OF R.C.C ELEMENTS
How much overlapping required for welding the reinforcement bars in Columns & beams
WHAT IS MEANT BY AEOLIAN SOIL?....
4 Answers L&T, Totem Infrastructure,
How to calculate the dia of reinforcement when required (as per drawing) dia of reinforcement steel not available at site?
3 Answers MNC, N J Devani Builders, Simplex,
How many kilo-newtons equals 1000 kilogram?
Is bulkage is considered in crushed sand? if yes..then what is the percentage ??
As we know that steel is a tension member but why we are using STRUCTURE STEEL as a COLUMN (Without concrete) where column is a compression member and compression strength of steel is very low
What goals do you have in your career?
WILL ANY COLLEAGUE TELL ME THAT WATER RATIO IS FIXED FOR ANY TYPE OF CONCRETE? OR HOW CAN WE DETERMINE THE RATIO OF WATER IN A CONCRETE MIX.